CLIENT
|
COUNTRY
|
PROJECT
|
YEAR
|
EQUIPMENT
|
Elevation Midstream
|
USA
|
Badger Process Station
|
2020
|
(2) Flash Drum packages and (4) Heater Treater Packages
|
Hyundai Engineering GS
|
Korea
|
Kerbala Refinery
|
2018
|
Erection of 42 petroleum Tanks Capacities between 15, 000 M3 to 60,000 M3
|
PDC Midstream
|
USA
|
Boreas Field
|
2019
|
Flash Drums and Separator packages (2 each)
|
Cardinal Midstream
|
USA
|
Iron Horse Field
|
2018
|
(2) 80 MMSCFD Gas Dehydration Units
|
Boardwalk Midstream
|
USA
|
Lake Charles Storage Facility
|
2017
|
Ethelyne Scrubbers and Filters
|
ADES
|
Egypt
|
Muzhil Field
|
2015
|
Production Train for MOPU
|
South Oil Company
|
Iraq
|
Luhais Field
|
2014
|
Fuel Gas Conditioning Unit
|
South Oil Company
|
IRAQ
|
Luhais Field
|
2014
|
(2) 50,000 bpd Crude Heaters
|
Occidental Petroleum
|
OMAN
|
|
2013
|
Desalter, 120” ID x 30’
|
KAR
|
Iraq
|
Khurmala Dome
|
2013
|
72” OD x 15’ KO Drum
|
Schlumberger
|
Columbia
|
Casabe South
|
2013
|
10’ x 23’ Electrostatic Heater Treater and 8’ x 15’ Second Stage Desalter
|
KOGAS
|
Korea
|
Kirkuk to Beiji Pipline
|
2012
|
16 inch and 18 inch pipeline 118 Km
|
UNICORNIO
|
Onshore
|
CACALILA - ALTAMIRA
|
2012
|
120” OD x 40’ Indirect Line Heater
|
KAR
|
Onshore
|
Khurmala Dome
|
2012
|
700 GPM Amine Plant #1 & #2
|
Baker Hughes
|
Onshore
|
US/Canada
|
2012
|
90” & 60” Mobile Test Separation Units
|
Cameron
|
Onshore
|
US
|
2012
|
2000 BPD Condensate Stabilization Unit
|
Schlumberger
|
Venzuela
|
Petrocarabobo
|
2012
|
Production Facility consisting of :Qty(2) 120” OD x 45’ Desalters Qty(2) 120” OD x 40’ Production Separators Qty(2) Pump Skid Packages Qty(2) Walnut Filter Skid Packages Qty(2) Exchanger Skid Packages
|
Schlumberger/Ecopetrel
|
Columbia
|
Casabe 5
|
2011
|
Design, supply and startup of two (2) 144” x 44’ x 13,000 bpd thermoelectric
|
McMoRan
|
GOM
|
Davy Jones 1
|
2011
|
700 GPM Amine Plant
|
Petrojet Khalda
|
Egypt
|
Indirect Heaters and Separators
|
2010
|
Vessel Design and Supply of Materials for (3) 72” OD x 20’0” Indirect Heaters and (3) 60” ID x 20’0” 3 Phase Separators 60” ID x 20’0” 3 Phase Separators
|
Enppi Petrotrade
|
Egypt
|
Agroud Area Suez
|
2010
|
60” OD x 20’0” S/S Heater Treater Design and Supply
|
Petrojet Khalda
|
Egypt
|
Desalter
|
2010
|
10’ OD x 20’0” S/S Desalters Design
|
Weatherford
|
Unknown
|
Pitless Air Drill
|
2010
|
7’-10.5” x 19’-4.5” Pitless Air Separator Design
|
Septa Energy
|
Nigeria
|
Unknown
|
2010
|
24” OD x 18” Pig Launcher and Receiver Vessel Design and Supply
|
Tarpon Energy
|
Canada
|
Electric Coalescer Internals
|
2010
|
Supply of Electrostatic Coalescing Vessel Internals and Transformer
|
Mercator Offshore
|
Nigeria
|
OML 67, Ebok Field
|
2010
|
Vessel Design and Supply of Materials for 2 Phase Separator, Dehydrator Vessel,Production Separator, Test Separator, HP Flare Scrubber, LP Flare Scrubber, Fuel Gas Knockout Drum
|
MMHE / PWL
|
Offshore FPSO Vietnam
|
Ruby Field
|
2009
|
Design and Supply of Glycol Dehydration System
|
Bumi Armada Berhad (BAB)/ENI
|
Offshore FPSO Nigeria
|
OML 120 OYO Field
|
2009
|
Design and Supply of Glycol Dehydration System
|
North Oil Company (NOC)
|
Iraq
|
Bai Hassan and Jambour Fields
|
2009
|
Design and Construction Management of (4) Four Glycol Dehydration Systems
|
Excel Exploration / Afren Resource
|
Nigeria
|
Eremor Creek
|
2009
|
120” OD x 30’ S/S Heater Treater Vessel & internals supply; Full grid section; 25 KVA Transformer Hookup; Piping General Arrangement
|
MMHE
|
Offshore Vietnam
|
Ruby Fields
|
2009
|
3.05M ID x 10.56M Electric Coalescer Vessel and internal supply; Piping General Arrangement
|
Bumi Armada Berhad (BAB)/ENI
|
Offshore FPSO Nigeria
|
OML 120 OYO Field
|
2009
|
3M ID x 10.8M Electric Coalescer Vessel and internal supply; Piping General Arrangement
|
BP
|
Onshore
|
Whitting Refinery
|
2009
|
Vessel Design and Supply of Materials for 60” OD x 25’ Reboiler, 36” OD x 18’ Still Column, and Stripping Column
|
Petrofac Khalda
|
Egypt
|
Salaam Gas Train SGT-3/4
|
2008
|
Design and Supply of (2) Two Glycol Dehydration Packages
|
SBM Atlantia Murphy
|
Offshore USA
|
Thunder Hawk Semi-Submersible
|
2008
|
Design and Supply of Glycol Dehydration Package
|
Nexus Floating Prododuction Ramboll
|
Offshore FPSO
|
Nexus FPSO
|
2008
|
Process and Mechanical Design and Detailed Drafting of Glycol Dehydration System
|
North Oil Company (NOC)
|
Onshore
|
Unknown
|
2008
|
Vessel & internals supply Full grid section; 100 KVA Transformer Hookup; Piping General Arrangement
|
Petro Techna
|
Onshore
|
Electric Desalter
|
2008
|
10’-0”OD x 50’-0” S/S Electric Desalter Vessel GA and internal details w/BOM; Full Bar Grid Section (3 Layer Bar Grid); (2) 75 KVA Transformers; Piping General Arrangement
|
Petro Techna
|
Onshore
|
Electric Desalter
|
2008
|
10’OD x 50’-0” S/S Electric Desalter Vessel GA and internal details w/BOM; Full Bar Grid Section (3 Layer Bar Grid); (2) 75 KVA Transformers; Piping General Arrangement
|
Petro Techna
|
Onshore
|
Electric Desalter
|
2008
|
12’OD x 60’-0” S/S Electric Desalter; Full Bar Grid Section (3 Layer Bar Grid); (2) 75kVA Transformers; Piping GA
|
Nexus
|
FPSO
|
Electric Coalescer
|
2008
|
144”OD x 37’-0” S/S Electric Coalescer Vessel Design and internals supply; Full Grid Section
|
SBM/LA Machinery
|
FPSO
|
Thunder Hawk
|
2008
|
144”OD x 36’-0” S/S Bulk Oil Treater Vessel GA and internal details; Full Grid Sections; 100 KVA Transformer
|
British Gas Flour Daniels
|
Offshore Trinidad
|
NCMA Phase 3C Poinsettia
|
2007
|
Design and Supply of Fuel Gas Skid Package
|
Neal & Massy Energy Services
|
Trinidad
|
Trinmar Operations Generation Platform GP-2
|
2007
|
Design and Supply of Vertical Vent Gas Scrubber Skid
|
PDVSA/AMR Process
|
Offshore Fixed
|
Electric Desalter
|
2007
|
12’-0”ID x 45’-0” S/S Electric Desalter Vessel & Grid GA and internal details w/BOM; Full Grid Section w/BOM; 150 KVA Transformer Hookup w/BOM
|
W&T Offshore
|
Offshore Fixed
|
Electric Heater Treater
|
2007
|
96”OD x 15’-0” S/S Electric Heater Treater Vessel GA and Internal details w/BOM; 4'- 2" Grid Section; 15 KVA Transformer Hookup; Piping General Arrangement
|
PT Expro / AMR Process
|
FPSO
|
Grids
|
2007
|
Grid GA w/BOM; Design and Supply of internals package; 1 @ 8’ x 30’, 1 @ 8’ x 40’
|
W&T Offshore
|
Offshore Fixed
|
Electric Treater
|
2007
|
96”OD x 15’-0” S/S Electric Treater New grids for an existing treater; 6'-0" Grid Section; 5 KVA Transformer; Piping General Arrangement
|
W&T Offshore
|
Offshore Fixed
|
Vertical Treater
|
2007
|
72”OD x 20’-0” S/S Vertical Treater Vessel Modification; Piping GA W/BOM
|
North Oil Company (NOC)
|
Iraq
|
Khurmala Dome
|
2006
|
Design and Supply of (2) Two Electrostatic Treaters and (4) Four Crude Heaters
|
North Oil Company (NOC)
|
Iraq
|
Khurmala Dome
|
2006
|
Design and Supply of 100 MMSCFD Glycol Dehydrationt and Regeneration Unit
|
Shell Exploration & Production
|
Offshore Floating Spar
|
Electric Treater
|
2006
|
96” ID x x30’-0” S/S Bulk Oil Electric Treater Vessel & Grid GA and internal details w/BOM; Electrical Components Hook-up w/BOM; 20' Grid Section; 50 KVA Transformer Hookup
|
PT Expro / AMR Process
|
Offshore Fixed
|
Heater Treater
|
2006
|
10’ OD x 40’-0” S/S Heater Treater Full Grid Section w/BOM; 100 KVA Transformer Hookup and Boot w/BOM; Supply of Internals
|
Newfield Exploration
|
Offshore Fixed
|
Oil Heater Treater
|
2006
|
96”OD x 30’-0” S/S Oil Heater Treater Vessel & Grid GA and internal details 15' Grid Section 15KVA Transformer Hookup
|
Natco - Electra
|
Unknown
|
Electric Treater
|
2006
|
72” OD x x14’-11” S/S Electric Treater Vessel GA and internal details w/BOM; 12'-3" Grid Section
|
Noble Energy
|
Offshore USA
|
Main-Pass 305A
|
2005
|
Process and Mechanical Design and Detailed Drafting of Glycol Dehydration System
|
Pemex Exploration
|
Mexico
|
Sinan A Platform
|
2005
|
Design and Supply of 48” OD x 15’ x 1800PSIG Horizontal Test Separator Package
|
Pemex Exploration
|
Mexico
|
Sinan A Platform
|
2005
|
Design and Supply of HP and LP Fuel gas Conditioning Packages
|
Pemex Exploration
|
Mexico
|
Sinan B Platform
|
2005
|
Design and Supply of 48” OD x 15’ x 1800PSIG Horizontal Test Separator Package
|
Pemex Exploration
|
Mexico
|
Sinan B Platform
|
2005
|
Design and Supply of HP and LP Fuel gas Conditioning Packages
|
Pemex Exploration
|
Mexico
|
Sinan C & D Platform
|
2005
|
Design and Supply of (2) Two 48” OD x 15’ x 1800PSIG Horizontal Test Separator Package
|
Seneca Resources
|
Offshore USA
|
Viosca Knoll 432
|
2005
|
Process and Mechanical Design and Detailed Drafting of Glycol Dehydration System
|
PT Expro / AMR Process
|
Offshore
|
Unknown
|
2005
|
96” OD x 40’-0” S/S Heater Treater Package included Vessel GA and internal drawings w/BOM; 17' Grid Section w/Details w/ BOM; 25kVA Transformer Wiring Schematic
|
Petro Techna Intl. LTD
|
Onshore
|
Unknown
|
2005
|
12’ ID x 44’9” T/T Desalter; Single Phase Electrode Assembly (Bar Grids Double Level) In Kind Replacement Grid General Assembly w/ BOM; Electrical Hookup drawings w/ BOM
|